Ryal Lab Construction Site
In Spring of 2008, Ryal Poppa (CMC '57) dedicated $250,000 to the construction of a computer lab to be located in a central residential area. The former Phillips Apartments fit that bill. Watch the progress of the construction of this lab. As we already have a Poppa Lab, thanks to Mr. Poppa's generosity, we are naming this lab the Ryal Residential Lab, or simply the Ryal Lab. Projected finish date: August 30, 2008. UPDATE: Aug 24, 2008 Job Log - description of what is happening as we proceed through the construction! Mouse over the thumbnails to see a full image. Click on a thumbnail to see an archive of all pictures taken from that angle. Pictures will be taken and posted as often as possible Last update: 8/20/08 Here is an image of the basic layout with the locations of the pictures in green. Mouse over to display image. Here is a quick image of the basic layout as it stands now - with the apartments. The locations of the pictures is in green." ![]() Here is a quick map of the campus with the location of the Ryal Lab highlighted with a blue circle. The Dorms are colored green, showing how central the Ryal Lab is to the residence halls. ![]() |